350 Cable Survey System
DPN 402197 © TSS (International) Ltd Page 2 of 30
7.1 BEFORE THE SURVEY
You should include the following considerations in the survey planning scheme:
1. Personnel and equipment availability.
Check the availability of a working 350 System and a TSS-trained operator for the
period of the survey. Refer to sub-section 7.1.1.
2. Tone frequency.
Choose a frequency for the tone, taking into account details such as the length of
the cable and the noise levels in the received bandwidth of the 350 System. Refer
to sub-section 7.1.2.
3. Survey requirements.
Define the type of survey and consider the possible compromise between accept-
able measurement accuracy and the time it takes to complete the survey. Refer to
sub-section 7.1.3.
4. Installation requirements. Refer to sub-section 7.1.4
Contact TSS for advice if necessary. You will find the contact details for TSS (Interna-
tional) Ltd on the title page of this Manual.
7.1.1 Personnel and Equipment Availability
When used properly, the TSS 350 System is a precision survey tool that provides val-
uable and detailed survey data to describe the track of a conductive target through
the survey area.
It is in the interest of the Survey Planners to ensure that appropriate personnel attend
one of the TSS Training Courses. Two levels of 350 Training Course are available.
Refer to Appendix B.2 for a description of each course.
Ensure that a 350 System in good working order and with a complete kit of spare
parts will be available at the time of the survey operation.